Kamloops backflow test deadline
Within 30 days of the test. That is the City of Kamloops's rule, quoted below from its own bylaw. Put in your building and your date, and you get the day it is due.
The rule, in the City of Kamloops's words
“all related Test Reports must: (vi) be submitted to the Utility Services Manager together with the fee specified in Schedule “A” within Thirty (30) calendar days of the test date or as otherwise directed by the Utility Services Manager”
Bylaw — Cross Connection Control Bylaw No. 12-71, 2022, s.4.6(a)(vi) · read 26-Sep-2026
Worth knowing: $10 per report, plus a data-entry fee on email or paper filings since 1 July 2025. A report received 30 or more days late may be rejected, which voids the test (s.4.7(g)).
What happens next
- Check your date above. The answer appears on this page straight away: the day your report is due, or which date we still need.
- If you leave your email (and tick “I would like a quote” if you want a price), a person replies in writing, usually the same day. Nothing is charged and nobody calls.
- A certified tester tests every device on the notice, annually.
- The report reaches the City of Kamloops inside the window. Reports go through FAST Tester. Keep the confirmation, not only your sent copy.
The date on your own notice always beats anything worked out here. Everything we have read about the City of Kamloops · Every BC deadline · Several buildings? The free audit