BackflowFiled

The report is done before you leave the room.

Record the test in the mechanical room, and keep recording it when the signal drops. The report, the tag and your customer's copy are ready to send before you reach the truck — on the CRD's own form — and the next test is dated the moment you finish.

No card. Sign in with Google or an email link. The first report is free, then 14 days of the firm plan. Or for $400 a month we do the whole programme for you.

How it works

1

Pick the device, enter the readings. Pass or fail is checked against the form's own thresholds as you type.

2

Complete the test. The purveyor's report renders field-for-field on the official layout, with the tag as a 4-up sheet.

3

Send it. One tap: the customer and you get the report and tag, with the PDF attached, and the record shows who it went to and when. The next test is already scheduled at 60, 30 and 7 days, with the overdue date on the job.

What it does

Readings survive a dropped signal

Enter readings with no bars and they are held on the phone, then synced once when you are back in range, with no duplicates.

Exactly where we are on that

Purveyor-exact forms

The CRD Backflow Preventer Test Report is reproduced section for section, in the July 2025 layout, checked field by field against the authority's own PDF.

The clock is built in

The report has to be received by the CCC Officer within 35 days of the notice — testing early does not help if the filing is late, so the report is ready to send the moment you finish. 14 days for a failed device on the portal, 30 days to repair, retest and notify. Each deadline is on the job.

Anyone can check a report is real

Every report carries a code. Type it in and the page shows what is on the document — the site, the date, the result, and whether a newer version has superseded it. No login, no account. A property manager can confirm the test happened. So can an insurer. So can the authority.

Check a reportSee the report itself

Pricing (CAD)

Hand us the paperwork, or run it yourself. First report free either way.

Done for you

We run your test programme

We load your customers, devices and history, produce your reports and get them to your customers, and run the reminder programme that brings the work back next year. Where an authority takes a filing in a way we can do on your behalf, we do that too — and where it does not, we say so rather than implying otherwise. You keep testing.

$400 / month

Plus $750 one time to load everything you already have. The software is included.

Do it yourself

Founding prices for the first 50 firms, locked for life.

Priced by how many devices you look after, not by how many tests you run.

Solo

$39 / month

Founding price · $69 after the first 50

Up to 500 devices. Unlimited tests, reminders, file of results.

Firm

$149 / month

Founding price · $229 after the first 50

Up to 2,500 devices. Your logo on every report and our name off it, plus a weekly due-list digest.

No per-seat fee. A second tester costs nothing.

Large

$449 / month

No founding discount on this band — it did not exist when the founding fifty were offered

Up to 10,000 devices. More than that, talk to us and we will work it out.

Tell us roughly how many devices you manage when you sign up — no proof needed, and we true it up from what you load. Annual plans get two months free. Any first paid month is refunded on request.

Questions

Do I have to move my customer list?
No. Add sites as you test them. Or send us a Syncta export or a spreadsheet and we load it for you.
What does the first report cost?
Nothing, and no card. After that you get 14 days of the full Firm plan, then pick the band that matches how many devices you look after.
Do you file it to the authority, or do I?
Today, you do — and we would rather say so than imply otherwise. When you send a report it goes to your customer and to you, with the PDF attached, ready to forward to the Cross Connection Control Officer. We do not yet send the authority's copy ourselves; we are not turning that on until the CRD confirms the inbox accepts filings, because a report that silently did not arrive is worse than one you sent yourself. A failed device is different and always will be: Bylaw 3516 s.7.3 requires it to go through the CRD's CCC Portal within 14 days, and no software can do that for you.
Which authorities do you support?
One, properly: the Capital Regional District, on the CRD's own Backflow Preventer Test Report as updated July 2025, checked field by field against their published PDF. If yours is not there, tell us which one — that is genuinely how the order gets decided.
Tell us which authority you file to
Is my logo on the report, or yours?
On the Firm plan and above, yours: upload it in settings and it prints top-left on every report, and you can switch our name off entirely. On Solo and pay-per-report, the report carries a small "Prepared with BackflowFiled" line in the footer. We would rather you knew that now than found it on a report you had already sent.
What happens to my records if I stop paying?
You keep them. Cancelling does not lock you out of your own tests or the PDFs you have produced — every one of them stays downloadable. Keeping those records is a legal obligation you carry personally, so holding them would be indefensible.

All of them →