West Kelowna backflow test deadline
Within 30 days of the test. That is the City of West Kelowna's rule, quoted below from its own bylaw. Put in your building and your date, and you get the day it is due.
The rule, in the City of West Kelowna's words
“The owner, occupant or Certified Backflow Assembly Tester, shall provide to the City within thirty (30) days of initial installation, repair, relocation or annual testing of a backflow preventer, a Backflow Assembly Test Report completed by a Certified Backflow Assembly Tester as per CSA B64.10.”
Bylaw — Water Regulation Bylaw No. 274, s.10.9 (the 48-hour swap rule is s.10.13) · read 26-Sep-2026
What happens next
- Check your date above. The answer appears on this page straight away: the day your report is due, or which date we still need.
- If you leave your email (and tick “I would like a quote” if you want a price), a person replies in writing, usually the same day. Nothing is charged and nobody calls.
- A certified tester tests every device on the notice, once in every 12 months.
- The report reaches the City of West Kelowna inside the window. The City of West Kelowna publishes no intake address we have been able to read; your tester or the notice will say where the report goes. Keep the confirmation, not only your sent copy.
The date on your own notice always beats anything worked out here. Everything we have read about the City of West Kelowna · Every BC deadline · Several buildings? The free audit