Penticton backflow test deadline
Within 48 hours (2 days) of the test. That is the City of Penticton's rule, quoted below from its own bylaw. Put in your building and your date, and you get the day it is due.
The rule, in the City of Penticton's words
“Copies of the test results shall be submitted to the Designated Officer within forty eight (48) hours thereafter.”
Bylaw — Irrigation, Sewer and Water Bylaw No. 2005-02, s.54 · read 26-Sep-2026
Worth knowing: The shortest window in BC we have read. The bylaw refers to a separate Cross Connection Control Bylaw 93-24, which is not in the City's online directory.
What happens next
- Check your date above. The answer appears on this page straight away: the day your report is due, or which date we still need.
- If you leave your email (and tick “I would like a quote” if you want a price), a person replies in writing, usually the same day. Nothing is charged and nobody calls.
- A certified tester tests every device on the notice, at installation, annually, and on repair, overhaul, relocation or cleaning.
- The report reaches the City of Penticton inside the window. The City of Penticton takes reports only through BSI Online. Keep the confirmation, not only your sent copy.
The date on your own notice always beats anything worked out here. Everything we have read about the City of Penticton · Every BC deadline · Several buildings? The free audit