Port Moody backflow test deadline
Within 30 days of the test, per the City's web page — the bylaw sets 30 days only from installation, repair or relocation. That is the City of Port Moody's rule, quoted below from its own web page. Put in your building and your date, and you get the day it is due.
The rule, in the City of Port Moody's words
“You must submit test reports to the BSI Online within 30 days of each backflow preventer test and inspection.”
The authority's own web page — City of Port Moody Cross Connection Control Program page; Water Supply and Distribution System Bylaw No. 3026, s.6.1(c)–(d) · read 26-Sep-2026
What happens next
- Check your date above. The answer appears on this page straight away: the day your report is due, or which date we still need.
- If you leave your email (and tick “I would like a quote” if you want a price), a person replies in writing, usually the same day. Nothing is charged and nobody calls.
- A certified tester tests every device on the notice, at least once every 12 months (premise isolation devices).
- The report reaches the City of Port Moody inside the window. The City of Port Moody takes reports only through BSI Online. Keep the confirmation, not only your sent copy.
The date on your own notice always beats anything worked out here. Everything we have read about the City of Port Moody · Every BC deadline · Several buildings? The free audit